Source Drm Pune X Handle (3/3)
🏗️ Yard Enhancements:
-Stabling Line 6: CSR 618.5m, CSL 606.5m
-Stabling Line 7: CSR 618.5m, CSL 606.5m
-ETR...
more... Line ➡️ ND Line 4: CSR 794m, CSL 788m
-MRJ Line 1: CSR 731.46m, CSL 721m
Pune Division is Proud to contribute to the efficiency and smooth operation of Central Railway!
please wait...Translate to English## Source Drm Pune X Handle (3/3)
🏗️ Yard Enhancements:
- Stabling Line 6: CSR 618.5m, CSL 606.5m
- Stabling Line 7: CSR 618.5m, CSL 606.5m
- ETR Line ➡️ ND Line 4: CSR 794m, CSL 788m
- MRJ Line 1: CSR 731.46m, CSL 721m
Pune Division is Proud to contribute to the efficiency and smooth operation of Central Railway!