Blog Entry# 693910
Posted: Mar 14 2013 (19:23)
12 Responses
Last Response: Apr 07 2013 (08:39)
AC-DC conversion 1500V-DC to 25KV-AC Electrification completed in mumbai central railway suburban section.
No need to say anything. the words painted on the wag-7 convey the message clearly to all. the test charge on the KYN-LTT section was carried out successfully on 30-12-2012.
By abhishek2023
This photo was taken on December 30, 2012 in Tilak Nagar, Mumbai, MAH, IN, using a Canon PowerShot SX130...
more...