Yes, only some patches of earthwork is still left and all the major and minor bridges are complete except for joining one girder over the Ganga river bridge. They're claiming that it will be completed before November but I think it will take them more than that.
At SFG no new building is added, the old Platform 1 was at Cantonment Side which was roadside entry and Platform 6 (which used to be 4, before they added 2 new platforms) had entrance building which was at old city side, now they have...
more... renumbered it through the entrance side, i.e. , the old city side entry, where there is a huge building and proper entrance gate is now Platform 1 and the Cantonment side area where there is no proper entrance building is now Platform 6.
They are making a 4 lane Road over Bridge as well as PRYJ- Bamrahuli 4th line which is elevated, so lot of people actually get confused and think that both are road flyovers.
You can checkout that guy's channel he had made a video from Subedarganj and everyone is confused in that video whether it's an elevated railway bridge or road bridge (the same channel that I shared for doubling work)