Blog Entry# 6184503
Posted: Sep 10 (07:12)
No Responses Yet
मेट्रो कॉरिडोर-दो का कंपनीबाग में पहला पियर कैप्स रखाThe first pier cap for the Kanpur Metro's elevated section from CSA to Barra-8 was placed on Monday at pillar number 14 near Company Bagh Crossing. This 4.5 km long section will have a total of 121 pier caps. This section will include five stations: Krishi Vishwavidyalaya, Vijay Nagar Chauraha, Shastri...
more... Chowk, Barra-7 and Barra-8.
Kanpur Metro ke CSA se Barra-8 tak ke elevated section mein pehla pier caps Company Bagh Chaurahe ke paas pillar number-14 pe rakha gaya. Is 4.5 km long section mein total 121 pier caps rakhe jayenge. Is section mein five stations honge: Krishi Vishwavidyalaya, Vijay Nagar Chauraha, Shastri Chowk, Barra-7 aur...
more... Barra-8.