Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Wed Oct 23 02:23:18 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 6174394
Posted: Aug 31 (19:02)

No Responses Yet
Rail News
1142 views
0

IR Affairs
SWR/South Western
Aug 31 (19:02)   Karnataka's Railway Expansion Faces Delays, Vande Bharat Express Introduction Impacted

Exynos9611~   22719 news posts
Entry# 6174394         Tags   Past Edits
Indian Railways: ಬೆಂಗಳೂರು- ವಿಜಯಪುರ ವಂದೇ ಭಾರತ್‌ ರೈಲಿಗೆ ಏನು ಅಡ್ಡಿ, ಕರ್ನಾಟಕದ 15ಕ್ಕೂ ರೈಲ್ವೆ ಮಾರ್ಗಗಳ ಸ್ಥಿತಿ ಹೇಗಿದೆ

Karnataka's railway network expansion is facing delays, impacting several projects, including the introduction of the Vande Bharat Express between Bengaluru and Vijayapura. Multiple projects, including the Gadag-Wadi, Dharwad-Belagavi, Tumakuru-Davanagere, and Tumakuru-Raichur lines, are facing delays due to land acquisition issues and other hurdles. A recent meeting between Karnataka's Infrastructure Development Minister...
more...
MB Patil and officials from the South Western Railway addressed these concerns and outlined steps to expedite the projects. The Gadag-Wadi line is anticipated to be completed by 2028, while the Bagalkote-Kudachi line is expected to be finished by December 2026. The Tumakuru-Davanagere line requires 300 acres of land acquisition and infrastructure modifications in the Vasant Narasapur industrial area. The Tumakuru-Raichur line is progressing, with tenders for the Koratagere-Madhugiri section released this month. The Madhugiri-Madakashira section will be tendered in September. The Chikkamagaluru-Hadiyahalli-Belur project is fully land-acquired, with the first phase (Chikkamagaluru-Hadiyahalli) completed. The Hadiyahalli-Belur section is expected to be finished in a year. The Hassan-Belur project requires 509 acres of land, with the need for expedited land acquisition and tendering. The Shivamogga-Shikaripura-Ranebennur project faces delays due to the lack of documentation handover from the land department to the railway. The Dharwad-Belagavi line, requiring 888 acres of land, faces significant delays and is anticipated to be finished by the end of 2027 if land acquisition is completed.

Karnataka me railway network badhane ka kaam bahut samay se chal raha hai, par bahut saare project abhi bhi delay ho rahe hain, jisme Bengaluru aur Vijayapura ke beech Vande Bharat Express chalana bhi shamil hai. Gadag-Wadi, Dharwad-Belagavi, Tumakuru-Davanagere, aur Tumakuru-Raichur jaise kai project land acquisition aur dusre problem ke wajah...
more...
se delay ho rahe hain. Karnataka ke Infrastructure Development Minister MB Patil aur South Western Railway ke officials ke beech hui ek meeting me is baat par baat hui aur projects jaldi complete karne ke liye kadam uthaye jaane ki baat hui. Gadag-Wadi line 2028 tak complete hone ki ummid hai, jabki Bagalkote-Kudachi line December 2026 tak khatam hone wali hai. Tumakuru-Davanagere line ke liye 300 acre land acquire karna padega aur Vasant Narasapur industrial area me infrastructure badalane ki jarurat hai. Tumakuru-Raichur line pe kaam jaldi chal raha hai, is month Koratagere-Madhugiri section ke liye tenders aa gaye hain. Madhugiri-Madakashira section ke liye September me tenders aayenge. Chikkamagaluru-Hadiyahalli-Belur project ka land puri tarah se acquire ho chuka hai, pehla phase (Chikkamagaluru-Hadiyahalli) khatam ho chuka hai. Hadiyahalli-Belur section ek saal me khatam hone ki ummid hai. Hassan-Belur project ke liye 509 acre land chahiye, jaldi land acquire karne aur tender lagane ki jarurat hai. Shivamogga-Shikaripura-Ranebennur project me delay is wajah se aa raha hai ki land department se railway ko documentation transfer nahi hua hai. Dharwad-Belagavi line ke liye 888 acre land chahiye, is project me bahut delay ho raha hai aur ummid hai ki agar land acquire ho gaya to yeh 2027 ke akhir tak khatam ho jayega.

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy