Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Fri Sep 13 10:49:48 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 6126520
Posted: Jul 15 (20:47)

No Responses Yet
Rail News
2079 views
0

Metro
UPMRC/Lucknow Metro
Jul 15 (20:46)   Delhi-Faridabad Metro Line Inaugurated, Kanpur Metro Undergoes Trial Run

Exynos9611~   19232 news posts
Entry# 6126520   News Entry# 560532         Tags   Past Edits
UPMRC Initiates Kanpur Metro’s Trial Run on MacRobertganj – Nayaganj Section

Prime Minister Narendra Modi inaugurated the Delhi-Faridabad Metro Line extension, connecting Badarpur to Escorts Mujesar in Faridabad. The 9-station, 95% indigenously built line cost Rs. 2,500 crore, with contributions from the Haryana government, the Centre, and the Delhi Metro. The line is elevated and runs along the Delhi-Mathura Road. Haryana Chief...
more...
Minister ML Khattar thanked Modi for the service and announced that a Metro connection between Gurgaon and Faridabad is in the works. Meanwhile, in Kanpur, the UPMRC conducted the first trial run of the Kanpur Metro on the underground section of Line 1, from MacRobertganj Ramp to Nayaganj. The trial run, at slow speeds, aimed to assess the interaction between infrastructure and trains and identify potential faults. The line was energised on July 11th after the installation of the Third Rail System. This section, built by Gulermak – Sam India Builtwell JV, is part of Package KNPCC-05 and cost Rs. 1042.26 crore. The underground section features 4 stations and was completed in March 2024 when TBM Tatya (S92) achieved the final tunnel breakthrough. UPMRC plans to test other subsystems in the coming weeks. The Kanpur Metro Phase 1, spanning 32.385 km with 2 corridors and 30 stations, received approval in February 2019. The priority corridor (IIT Kanpur to Moti Jheel) became operational in December 2021, and the remaining portion is expected to be operational by the end of 2024.

Prime Minister Narendra Modi ne Delhi-Faridabad Metro Line extension ka udbodhan kiya, jo Badarpur se Escorts Mujesar, Faridabad tak jaata hai. Ye 9 station waali line 95% deshi banai gayi hai aur iska kharcha Rs. 2,500 crore hai, jisme Haryana government, Centre aur Delhi Metro ka contribution hai. Ye line elevated...
more...
hai aur Delhi-Mathura Road pe chalti hai. Haryana ke Chief Minister ML Khattar ne Modi ka dhanyavaad kiya aur bataya ki Gurgaon aur Faridabad ko Metro se jodne ki plan bhi ban rahi hai. Iske saath hi, Kanpur me, UPMRC ne Line 1 ke underground section me, MacRobertganj Ramp se Nayaganj tak Kanpur Metro ka pehla trial run kiya. Ye trial run, dhimi speed pe, infrastructure aur trains ke interaction ka jaanch karne ke liye tha aur koi bhi fault dhundne ke liye tha. Line ko July 11th ko energised kiya gaya, Third Rail System lagne ke baad. Ye section, Gulermak – Sam India Builtwell JV dwara banaya gaya, Package KNPCC-05 ka hissa hai aur iska kharcha Rs. 1042.26 crore hai. Underground section me 4 station hain aur yeh March 2024 me complete hua jab TBM Tatya (S92) ne final tunnel breakthrough kiya. UPMRC aage aane wale hafte me aur bhi subsystems ka test karne wala hai. Kanpur Metro Phase 1, jo 32.385 km lamba hai aur 2 corridors aur 30 station hai, February 2019 me approval mila tha. Priority corridor (IIT Kanpur se Moti Jheel) December 2021 me operational ho gaya, aur baki ka hissa 2024 ke aakhri tak operational hone ki ummeed hai.

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

6177596 ★★ 29KeepTravelling^~
6186110  10Rail_0326~
6186432 ★★★ 41PankajMishra^~
3368675 ★★★ 393mr.train_wala~
6007860 ★★★ 113RailwayFiles~
3619297 ★★★ 396HBR^~
4307803 ★★★ 178AvishekRay~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy