Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sat Sep 14 15:01:13 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 5986329
Posted: Mar 04 (10:48)

No Responses Yet
Rail News
7286 views
1

Metro
WR/Western
Mar 04 (10:48)   Indore Metro Set for Commercial Launch in September on Priority Corridor

AdittyaaSharma^~   73345 news posts
Entry# 5986329   News Entry# 543777         Tags   Past Edits
Metro In Indore: इंदौर डिपो में पांच मेट्रो, वायडक्ट पर भी दिखने लगी रफ्तार

Indore's Metro is nearing completion, with commercial operations scheduled to begin in September on the 5.9km Priority Corridor between Gandhi Nagar and Super Corridor. Five metro sets (each comprising three coaches) have been delivered to the Gandhi Nagar depot, four of which have been tested on the depot's track, while two...
more...
have undergone trials on the viaduct. The remaining two sets will be tested on the viaduct within the next 10-15 days. Construction of the Priority Corridor is progressing, with work on the viaduct from Gandhi Nagar Depot to the Lovekush intersection nearing completion. Steel girders have been installed above the railway line at MR-10, and the remaining girders for the bridge near the Super Corridor will be installed in the coming days. The Lovekush intersection section is also nearing completion, with the construction of the pier cap over the unfinished Pier P-884. Piling work for Pier P-885 has also begun. The last pile for the metro track from Gandhi Nagar to ISBT is being installed, and the pillars at the Lovekush intersection are expected to be erected within the next 25 days, enabling the construction of the viaduct in that section. The construction of stations along the 8km stretch is also underway, with the Gandhi Nagar station already complete. The remaining stations on the Priority Corridor are nearing completion, with work on sheds, platforms, and entry/exit routes progressing. Stations beyond the Priority Corridor are also under construction, with work on platforms, sheds, and girders ongoing.

Indore mein Metro ka kaam almost khatam ho gaya hai, aur September mein Gandhi Nagar aur Super Corridor ke beech 5.9 kilometer Priority Corridor pe commercial run start hone wala hai. Gandhi Nagar depot pe panch metro set (har ek set mein teen coach) aa gaye hain. Inme se chaar metro...
more...
set ko depot ke track pe test kiya gaya hai, aur do ko viaduct pe trial kiya gaya hai. Baki do set ko aage ke 10-15 din mein viaduct pe chalaaya jaayega. Priority Corridor ka construction kaam tez chal raha hai, Gandhi Nagar Depot se Lovekush intersection tak viaduct ka kaam almost khatam ho gaya hai. MR-10 pe railway line ke upar steel girder laga diye gaye hain, aur Super Corridor ke paas bridge ke baki girder aage aane wale dinon mein laga diye jaayenge. Lovekush intersection section bhi almost khatam hone wala hai, unfinished Pier P-884 pe pier cap ban raha hai. Pier P-885 ke liye piling ka kaam bhi start ho gaya hai. Gandhi Nagar se ISBT tak metro track ka aakhri pile lagaaya ja raha hai, aur Lovekush intersection pe pillar aage ke 25 din mein lag jaayenge, is section pe viaduct ka construction kaam shuru ho jaayega. 8 kilometer stretch pe station ka construction kaam bhi chal raha hai, Gandhi Nagar station already complete ho gaya hai. Priority Corridor ke baki station almost khatam ho gaye hain, sheds, platforms, aur entry/exit route ka kaam chal raha hai. Priority Corridor ke baad aane wale station bhi ban rahe hain, platforms, sheds, aur girder ka kaam chal raha hai.

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

4402199 ★★★ 264AvishekRay~
4387942 ★★★ 61AvishekRay~
6186110  11Rail_0326~
5955786 ★★★ 51fanof12801~
6177596 ★★ 29KeepTravelling^~
6186432 ★★★ 41PankajMishra^~
3368675 ★★★ 393mr.train_wala~
6007860 ★★★ 113RailwayFiles~
3619297 ★★★ 396HBR^~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy