Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Tue Sep 24 06:00:02 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 5915392
Posted: Dec 18 2023 (20:53)

No Responses Yet
Rail News
6891 views
0

Metro
MMOPL/Mumbai Metro
Dec 18 2023 (20:53)   MMRDA Re-invites Tenders for Mumbai Metro's Line-12 (Orange Line)

Exynos9611~   19860 news posts
Entry# 5915392         Tags   Past Edits
MMRDA floated tender for construction of 22-km long Mumbai Metro Line 12

The Mumbai Metropolitan Region Development Authority (MMRDA) has re-issued tenders for the civil construction of Mumbai Metro's Line-12 (Orange Line), a 22.17 km elevated line with 19 stations connecting Kalyan, Dombivali, and Amandoot (Taloja). This line will be an extension of the under-construction Line-5 (Thane – Bhiwandi – Kalyan). Originally planned...
more...
as two separate packages, the project has been consolidated into a single tender, CA-240, with an estimated cost of Rs 4,132 crore. The project's scope includes the construction of an elevated viaduct, 19 stations, and a connecting line to the depot. The northern terminal of Line-12 will now be at Kalyan Railway Station, incorporating two new stations from Line-5. Line-5's length has been shortened due to the integration of the Kalyan – Ganesh Nagar section into Line-12. This re-tendering reflects MMRDA's dedication to optimizing Mumbai's metro network and improving transportation within the city.

Mumbai Metro ki Line-12 (Orange Line) ke liye, MMRDA ne civil construction ke tenders dobara issue kiye hain. Yeh 22.17 km lambi line 19 stations ke saath Kalyan, Dombivali aur Amandoot (Taloja) ko connect karegi. Yeh under-construction Line-5 (Thane – Bhiwandi – Kalyan) ka extension hoga. Pehle do alag packages mein...
more...
plan kiya gaya tha, ab project ko ek single tender, CA-240 mein consolidate kiya gaya hai, jiska estimated cost Rs 4,132 crore hai. Project mein elevated viaduct, 19 stations aur depot se connecting line ka construction shamil hai. Line-12 ka northern terminal ab Kalyan Railway Station pe hoga, jisme Line-5 ke do new stations include kiye gaye hain. Line-5 ki length kam ho gayi hai kyunki Kalyan – Ganesh Nagar section ko Line-12 mein integrate kiya gaya hai. Ye re-tendering MMRDA ki dedication ko reflect karta hai ki Mumbai ka metro network optimize kiya jaaye aur city mein transportation improve ho.

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy