New coach indication boards installed at NRT PF1. But not operational. Extension of station building is going on. The existing platforms will still be extended towards the city side. The existing lines are 4 including that of the goods line. So during doubling, the platforms will be 4 or more as the land is available on other side and the goods shed is also being shifted to munamaka. The PF 2&3 హైట్ will be raised