NER should look for increasing MPS of Rambag - Banaras line as currently, Jhusi - Gyanpur Road Single Line MPS is 110 nd Gyanpur Road - Banaras Double Line MPS is 100.
If MPS increases to 130. Then Jhusi - Bhulanpur (Approx 110 Kms.) Can be easily covered in 1 Hour. So Whole PRYJ-BSB can be covered in 1 Hour 30 Minutes approx.