It is a very good supporting station of Darbhanga Junction. There are 3 platforms in total., (6 Line including 1 Fright Point).
The yard is now very large.
You can do railfanings here very well for passing and stopping trains.
Probably sometimes skipping train also Stop here as Unscheduled Halt. That can easily take photos of these train.
Earlier...
more... there was only one platform and 4 lines.. (One for Fright point).
As New Remodeling of Station & Yard Its. Totally Changed.
Old Line no./pf 1 changed to Line no.2 (Up Main)
Old Line no. 2 changed to Line no. 3 (Dn Main)
Old Line no. 3 changed to Line no. 4 (Pf2)
Old Line no. 4 Disclosed. & PF 2 & 3 Constructed.
----------
New Line & PFs.
1. A new line has been constructed inside Old Line no. 1
Which called new Pf 1 or Line no.1
2. 2 new Line Constructed in Place of Fright point which is new line no. 5 (pf3) & 6
Now Line no. 3,4,5 & 6 are electrified.
& Line no. 1 & 2 will Electrified soon.
Line no. 1 will not fit at this time.
Work is under going.
All regular train Coming at Pf2.
Sometimes at Pf3.
Fright train coming at Line 2,3 & 6 (Unloading).