Work is happening only on the track from SBC to BWT before DKN between MLO and DKN. Hence, trains to SBC maintain 50-60kmph while trains from SBC run at 20kmph. Observed this while travelling in 22682 and 12028. Also, there is a TSR of 20 for trains towards BNC.