New entrance building looking huge than present entrance.. I think this entrance will be like Terminal entrance from where mostly Originating trains start where as passing trains come in present PFs. I guess that TSS is getting constructed on GTL line side beside EMD shed area where railways have plenty of vacant area for future development works.. And that Long FOB is to connect the New entrance to Gadag road from where public use to reach new entrance using this connecting FOB.