Sir, the load of this train is only 15 coaches, including EOGs. LHB trains with rake length of up to 18 coaches, including EOGs, can run at 130 kmph in NCR and do not require any CRS sanction. The 22109/22110 has 20 coaches, which is why it needs a fresh CRS sanction to run at 130 in NCR. It has been pending for a long time and only god knows when it will happen. The Rajdhani ran at 130 yesterday, including the return journey, when there were 3 extra coaches, increasing the rake length to 18 coaches. Lastly, the way section controlling is done in today’s times, the trains with premium tags always get the highest priority.