12028 cannot be short terminated at KPD as 99% of bookings are from/to MAS. It should have been cancelled fully instead. Running an empty AC train from KPD to SBC is probably not worth the operational cost. Way too many last minute cancellations have happened on Saturday thanks to poor planning. None of these huge line blocks are possible without cancellations and I was quite surprised SR didnt announce these cancellations long ago.