(LTT-NZM, load 20B) detained between PWL-AST for SIV (Hirect) external fault. LP put HBA Off/On, HSIV & HRAVT on zero but no success. R/given. IA-29.10.17, TI/NKJ-08.11.17, Section major: PWL-NZM (Palwal-Nizamuddin), Minor: PWL-AST (Palwal-Asaoti). Time: 10.38-12.50 (132-12=120"). Loco at NZM found QCON timer malfunctioning.
loco fail yest