Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Thu Sep 19 15:46:40 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 2311507
Posted: Jun 08 2017 (11:13)

No Responses Yet
General Travel
8228 views
0

Jun 08 2017 (11:13)   BZA/Vijayawada Junction (10 PFs)
SouthCoastalRailways~   1147 blog posts
Entry# 2311507            Tags   Past Edits
Vijayawada-Bhimavaram, Narsapur-Machilipatnam doubling and electrification works going on, says DRM
South Central Railway (SCR), Vijayawada Divisional Railway Manager (DRM), R. Dhananjayulu, who took stock of the situation in the division after taking charge on April 17 this year, has focussed on expediting the new projects, including connectivity to the A.P. capital city Amaravati. Priority is being given for safety, passenger amenities and increasing passenger and freight revenues in the division, the DRM said in an interview with The Hindu.
Vijayawada railway station recently bagged the fourth place in cleanliness. What is your response?
...
more...

The credit goes to the passengers who are cooperating with the railway authorities in maintaining hygienic conditions in Vijayawada station premises as well as on moving trains. I congratulate the staff for the achievement. About 200 sanitation staff were deployed in the station with cleaning machines and 150 staff were arranged to clean the bogies.
What are the steps being taken to maintain quality in food items and drinking water in canteens on platforms?
SCR will supply Krishna water in the station after purification. We clean water tanks and take up chlorination frequently.
Officials concerned will conduct random checking and the water being supplied through tanks is cent per cent safe.
As regards food items, we will conduct surprise checks in canteens and check quality of food. Railways will not compromise on food quality and we will not hesitate to cancel licences, if any vendor fails to maintain standards.
What is the status of new projects in the division?
We are waiting for approval for rail connectivity to new Capital, Amaravati. The Vijayawada-Bhimavaram, Narsapur-Machilipatnam doubling and electrification works are going on. Likewise, third line works are under progress between Vijayawada-Kazipet and Vijayawada-Gudur-Chennai. As part, the Vijayawada-Kondapalli third line will be commissioned shortly.
How are the earnings of Vijayawada division?
Going to the previous year’s figures, the freight revenue is not good as coal imports from other countries have stopped. Instead, we are focussing on alternative loadings such as fertilizers, bauxite, laterite, aluminium fins and gypsum. This year, both the passenger and freight revenue earnings show positive growth in the last two months.
54 surveillance cameras
Explain about security on stations and running trains.
In all, 54 surveillance cameras were installed in Vijayawada railway station. The GRP and RPF identified vulnerable trains and sections and there were no major thefts and the crime rate has come down in the division.
What are the benefits of Route Relay Interlocking (RRI), which was completed recently in Vijayawada station?
RRI has increased operational manoeuvrability and safety. More than 700 routes are possible after RRI, which was taken up with advanced technology.
Give details on passenger amenities in stations.
In Vijayawada railway station, escalators were provided on platforms 2 to 7, and now we are installing escalators on 8 and 9 platforms. Besides, lifts were provided.
The bids will be opened by this month end for Station Re-Development Programme which will provide more facilities for the commuters.
What are the steps being taken to prevent accidents at railway gates?
We have 23 unmanned level crossing gates in Vijayawada Railway Division. We will remove all the unmanned gates by this year end in a phased manner.
click here

Translate to English
Translate to Hindi

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy