a few weeks back something similar happened temporarily in some train in the south where SL coaches were replaced with 3A due to paucity of SL coaches. This set off the rumour that IR was going to replace SL with 3A across the board and caused such a ruckus that railway had to issue a clarification that it had no such plans.
Never gonna happen mate!