Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Search Trains
 ↓ 
×
DOJ:
Dep:
SunMonTueWedThuFriSat
Class:
2SSLCCEx3AFC2A1A3EEAVSEV
Type:
 

Train Details
Words:
LHB/ICF/TrainSet:
Pantry:
In-Coach Catering/Pantry Car
Loco:
Reversal:
Rake Reversal at Any Stn
Rake:
RSA:
With RSA
Inaug:
 to 
# Halts: to 
Trvl Time: to  (in hrs)
Distance: to  (in kms)
Speed: to  (in km/h)

Departure Details
Include nearby Stations:      ONLY this Station:
Dep Between:    
Dep PF#:
Reversal:
Rake Reversal at Dep Stn

Arrival Details
Include nearby Stations:      ONLY this Station:
Arr Days:
SunMonTueWedThuFriSat
Arr Between:    
Arr PF#:
Reversal:
Rake Reversal at Arr Stn

Search
  Go  
dark modesite support
 
IRI is in Maintenance Mode. Blog Postings and other site edits will not work for about 5 minutes.
Fri Sep 27 09:56:33 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz Feed
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search
no description available
Entry# 5705980-0

12563⇒22103/Mumbai LTT - Ayodhya Cantt. SF Express (PT)
Other Names: Kurla - Faizabad Express
मुंबई लोकमान्य तिलक टर्मिनस - अयोध्या कैन्ट सुपरफास्ट एक्सप्रेस

BSL/Bhusaval Junction --> JBP/Jabalpur

Latest News
(You need to double-check/verify this info yourself)
Train no. 22103/Mumbai LTT - Ayodhya Cantt. SF Express (PT) JCO 20/03/2023 will be diverted to run via PFM - PRATAPGARH - SULTANPUR - AYODHYA CANTT due to non-interlocking work in connection with doubling work of Goshaiganj - Ulnabhari - Bilharghat - Darshan Nagar o­n Barabanki - Ayodhya Cantt -...
more...
Akbarpur - Zafrabad section over LKO Division.
Sat Mar 18, 2023 (10:38AM)
News History
• JCO 20.02.2023 will be diverted to run Via Zafarabad-Sultanpur-Ayodhya Cantt due to Non- Interlocking work at Kheta Sarai and Shahganj stations o­n Barabanki –Ayodhya Cantt - Akbarpur - Zafarabad section of Lucknow Division over NR
Sat Feb 18, 2023 (11:12AM)
Will run end to end with Electric traction between LTT-AYC-LTT avoiding traction change at PRYJ. Electric loco will be provided in train no. 22103 from PRYJ to AYC w.e.f 26.04.2022 Ex PRYJ.
Thu Apr 21, 2022 (03:36PM)
Revised Coach Composition W. E. F 07/02/2022 ex Lokmanya Tilak - AC 2 Tier (2A) - 1. AC 3 Tier (3A) - 5. AC 3 Economy (3E) - 1. Sleeper (SL) - 10. General (2S) - 3. EOG -2.
Mon Jan 31, 2022 (10:14PM)
Running with Regular Train No
Wed Nov 24, 2021 (08:43AM)
2 Follows
Bedroll/Linen: AVAILABLE change
Inaugural Run
Thu Jan 06, 2011
Pantry/Catering
✕ Pantry Car
✓ On-board Catering
✓ E-Catering
Updated: Aug 24 (21:31) by SatavahanaSFExp^
Dep:
Arr:
Rating: 3.8/5 (34 votes)
cleanliness - good (6)
punctuality - good (7)
food - good (4)
ticket avbl - good (6)
u/r coach - good (3)
railfanning - good (5)
safety - good (6)
LHB Rake

Rake/Coach Position

  0
  L
  1
EOG
  2
 GS
  3
 GS
  4
 A1
  5
 B7
  6
 B6
  7
 B5
  8
 B4
  9
 B3
 10
 B2
 11
 B1
 12
 S9
 13
 S8
 14
 S7
 15
 S6
 16
 S5
 17
 S4
 18
 S3
 19
 S2
 20
 S1
 21
 GS
 22
EOG
PRYJ
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train Forum

Page#    330 blog entries  <<prev  next>>
Info Update
19188 views
1

Jan 10 2019 (14:02)   22103/Mumbai LTT - Ayodhya Cantt. SF Express (PT)
guest   6732 blog posts
Entry# 4192738            Tags   Past Edits
Will be back to ICF rake from May 2019
Translate to English
Translate to Hindi

1 Posts

14810 views
1

Jan 10 2019 (22:28)
guest   6732 blog posts
Re# 4192738-2              
Rake standardisation
Translate to English
Translate to Hindi

1 Posts

13628 views
0

Jan 10 2019 (22:36)
Ratnakar~
Ratnakar~   8272 blog posts
Re# 4192738-4              
Frequent news of conversion of LHB trains back to ICF these days. Read about some other trains too yesterday
Translate to English
Translate to Hindi

14688 views
1

Jan 10 2019 (22:38)
guest   6732 blog posts
Re# 4192738-5              
No idea about that. This would get rake standardised with LTT GKP Exp
Translate to English
Translate to Hindi

14677 views
0

Jan 10 2019 (22:39)
guest   6732 blog posts
Re# 4192738-6              
All due to standardisation
Translate to English
Translate to Hindi
General Travel
21490 views
2

Nov 09 2018 (22:13)   22103/Mumbai LTT - Ayodhya Cantt. SF Express (PT) | SRID/Shridham (3 PFs) | LDH/WDP-4D/40477
AYUSHBAMORIYA~
AYUSHBAMORIYA~   842 blog posts
Entry# 3989655            Tags   Past Edits
ENJOY THE VIDEO OF FAIZABAD SUPER EXPRESS WITH HUGE OFFLINK LUDHIANA WDP 4D ARRIVING AT SHRIDHAM
PLZ LIKE SHARE AND SUBSCRIBE ME ON YT
Translate to English
Translate to Hindi
Rail Fanning
20138 views
0

Nov 18 2018 (16:49)   12151/Samarsata SF Express (PT) | VSU/Bishnupur Junction (3 PFs) | SRC/WAP-4/22879
Anubad_008^~
Anubad_008^~   5315 blog posts
Entry# 4018227            Tags   Past Edits
Video Link:-click here
Lokmanya Tilak Terminus - Howrah: LHB Samarsata rampage through SER!!
12151 Lokmanya Tilak Terminus - Howrah Samarsata Express rampage through Bishnupur Junction in early morning,zips through KGP-ADRA Section,led by 22879 Santragachi WAP4 .RSA Belongs with 12101/02 Jnaswari Super Delux Express and Faizabad Express.This train was running late 2hrs 20 mins . Please like , subscribe and comment.
Translate to English
Translate to Hindi
Rail Fanning
19210 views
0

Aug 31 2018 (11:03)   22104/Ayodhya Cantt. - Mumbai LTT SF Express | KY/Kareli (2 PFs)
DEEPENDRA~
DEEPENDRA~   348 blog posts
Entry# 3765241            Tags  
AGGRESSIVE ACTION AND CHUGGING BY ET ALCO
LET RUNNING 22104 faizabad ltt sf exp
29/august/2018
Evening-18.30pm
Kareli(wcr)
Translate to English
Translate to Hindi
General Travel
36649 views
42

★★★
Apr 05 2017 (12:40)   22104/Ayodhya Cantt. - Mumbai LTT SF Express | ET/Itarsi Junction (8 PFs)
AbhishekJog^~
AbhishekJog^~   1895 blog posts
Entry# 2223292            Tags  
Turquoise livered KTE WDM-3A #18857 greets ET WDM-3A Twins.
KTE WDM-3A was hauling before time running 22104 Faizabad-LTT SF Express.
Translate to English
Translate to Hindi

2 Posts

16480 views
0

May 10 2017 (13:52)
NamanL^~
NamanL^~   3444 blog posts
Re# 2223292-3              
is it old pic right?
Translate to English
Translate to Hindi

16474 views
0

May 11 2017 (16:19)
robin~
robin~   6144 blog posts
Re# 2223292-4              
in todays naidunia newspaper news came that PPI-KEQ electrification work is nearing completion and now testing is in process and soon KEQ-JBP scetion will also get electrified so i dont think PPI-JBP section efication will be completed in 2018 rather it will be completing in this year by OCT/DEC
Translate to English
Translate to Hindi

16913 views
2

May 11 2017 (16:32)
Shashank^~
Shashank^~   7686 blog posts
Re# 2223292-5              
I recently traveled in PPI-NU section, work is 70% done. Poles are erected almost everywhere except a small patch near gadarwara. It may complete this year itself.
Translate to English
Translate to Hindi

17404 views
0

May 11 2017 (16:39)
~   1827 blog posts
Re# 2223292-6              
PPI-KEQ electrification work is nearing completion !!!!!!!!! Kuch bhi , kha yaar abhi bahut time hai
Translate to English
Translate to Hindi

16211 views
0

May 12 2017 (01:56)
robin~
robin~   6144 blog posts
Re# 2223292-7              
Aisa newspaper wale chhape hai ab wo to samay hi batayga ki kb pura hoga kaam
Translate to English
Translate to Hindi
Page#    330 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy