Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Search Trains
 ↓ 
×
DOJ:
Dep:
SunMonTueWedThuFriSat
Class:
2SSLCCEx3AFC2A1A3EEAVSEV
Type:
 

Train Details
Words:
LHB/ICF/TrainSet:
Pantry:
In-Coach Catering/Pantry Car
Loco:
Reversal:
Rake Reversal at Any Stn
Rake:
RSA:
With RSA
Inaug:
 to 
# Halts: to 
Trvl Time: to  (in hrs)
Distance: to  (in kms)
Speed: to  (in km/h)

Departure Details
Include nearby Stations:      ONLY this Station:
Dep Between:    
Dep PF#:
Reversal:
Rake Reversal at Dep Stn

Arrival Details
Include nearby Stations:      ONLY this Station:
Arr Days:
SunMonTueWedThuFriSat
Arr Between:    
Arr PF#:
Reversal:
Rake Reversal at Arr Stn

Search
  Go  
dark modesite support
 
IRI is in Maintenance Mode. Blog Postings and other site edits will not work for about 5 minutes.
Sat Sep 28 01:01:21 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz Feed
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

18189/Tatanagar - Ernakulam Jn. Express (PT)
टाटानगर - एरणाकुलम जंक्शन एक्सप्रेस

VZM/Vizianagaram Junction --> GDR/Gudur Junction

Latest News
(You need to double-check/verify this info yourself)
▪️ Departure from Tatanagar on 02.09.24 is cancelled
Sun Sep 01, 2024 (09:40PM)
News History
Train No. 18189 Tatanagar – Ernakulam Express leaving Tatanagar at 05.15 hrs on 01st August, 2024 will run as per normal schedule. Earlier notified cancellation withdrawn.
Wed Jul 31, 2024 (07:07PM)
▪️ Departure from Tatanagar on 31.07.24 & 01.08.24 is cancelled ▪️ Departure from Tatanagar on 30.07.24 is diverted via Rajkharswan - Dongaposi - Banspani - Jakhapura - Bhubaneswar - Vizianagaram
Tue Jul 30, 2024 (11:20AM)
▪️ Departure from Tatanagar on 31.07.24 is cancelled ▪️ Departure from Tatanagar on 30.07.24 is diverted via Rajkharswan - Dongaposi - Banspani - Jakhapura - Bhubaneswar - Vizianagaram
Tue Jul 30, 2024 (10:56AM)
▪️ Departure from Tatanagar on 30.07.24 is diverted via Rajkharswan - Dongaposi - Banspani - Jakhapura - Bhubaneswar - Vizianagaram
Tue Jul 30, 2024 (10:00AM)
▪️ Rescheduled to leave Tatanagar at 06.45 hrs instead of 05.15 hrs on 05.07.24
Thu Jul 04, 2024 (01:02AM)
J.C.F. 7.6.24 - 14.6.24 will be diverted via Jaroli - Jakhapura - Cuttack - Vizianagaram
Fri May 31, 2024 (04:11AM)
▪️ Rescheduled to leave Tatanagar at 09.15 hrs instead of 05.15 hrs on 13.04.24▪️ Departure from Tatanagar from 15.04.24 - 24.04.24 will be diverted via Rajkharswan - Jaroli - Jakhapura - Bhubaneswar - Vizianagaram
Thu Apr 11, 2024 (08:23PM)
▪️ Departure from Tatanagar from 15.04.24 - 24.04.24 will be diverted via Rajkharswan - Jaroli - Jakhapura - Bhubaneswar - Vizianagaram
Wed Apr 10, 2024 (03:11PM)
18189 Tatanagar-Ernakulam Express journey commencing w.e.f 07.03.2024 will now run daily from Tatanagar.
Wed Mar 06, 2024 (11:12AM)
▪️ Departure from Tatanagar from 29.02.2024 & 03.03.2024 will be diverted to run via Jaroli, Palasa and Vizianagaram skipping stoppages at Chakradharpur, Goilkera, Jaraikela, Rourkela, Rajgangpur, Jharsuguda, Sambalpur, Bargarh Road, Balangir, Titlagarh, Kesinga, Ambodala, Muniguda, Rayagada, Parvatipuram and Bobbili. ▪️ To Run on Daily Basis W.E.F 07.03.24. Ex. TATA ▪️ Revised...
more...
Coach Composition: EOG - 1, LSLRD - 1, GS - 2, PC - 1, Sleeper Class - 4, AC III Tier Economy - 3, AC III Tier - 7 & AC II Tier - 3 = Total 22 LHB Coaches W.E.F 07.03.2024. Ex. TATA
Wed Feb 28, 2024 (11:07PM)
▪️ Departure from Tatanagar from 29.02.2024 & 03.03.2024 will be diverted to run via Jaroli, Palasa and Vizianagaram skipping stoppages at Chakradharpur, Goilkera, Jaraikela, Rourkela, Rajgangpur, Jharsuguda, Sambalpur, Bargarh Road, Balangir, Titlagarh, Kesinga, Ambodala, Muniguda, Rayagada, Parvatipuram and Bobbili.
Sun Feb 25, 2024 (12:56AM)
▪️ Departure from Tatanagar from 21.01.24 - 25.01.24 will be diverted via Rajkharswan - Jaroli - Bhubaneswar - Vizianagaram ▪️Revised Coach Composition: EOG - 1, LSLRD - 1, GS - 2, PC - 1, Sleeper Class - 4, AC III Tier Economy - 3, AC III Tier - 7 & AC...
more...
II Tier - 3 = Total 22 LHB Coaches WEF 07/03/2024. Ex. TATA
Mon Jan 15, 2024 (09:26PM)
Revised Coach Composition: EOG - 1, LSLRD - 1, GS - 2, PC - 1, Sleeper Class - 4, AC III Tier Economy - 3, AC III Tier - 7 & AC II Tier - 3 = Total 22 LHB Coaches WEF 07/03/2024. Ex. TATA
Fri Dec 29, 2023 (07:36PM)
▪️ To Run 5 Days a Week W.E.F 01.01.24. Ex. TATA▪️ Revised Coach Composition: EOG - 1, LSLRD - 1, GS - 2, PC - 1, Sleeper Class - 4, AC III Tier Economy - 3, AC III Tier - 7 & AC II Tier - 3 = Total 22 LHB...
more...
Coaches WEF 07/03/2024. Ex. TATA
Wed Dec 20, 2023 (08:30PM)
▪️ Cancelled on 03.12.23▪️ Revised Coach Composition: EOG - 1, LSLRD - 1, GS - 2, PC - 1, Sleeper Class - 4, AC III Tier Economy - 3, AC III Tier - 7 & AC II Tier - 3 = Total 22 LHB Coaches WEF 07/03/2024. Ex. TATA
Sat Dec 02,
...
more...
2023 (05:42PM)
▪️ Revised Coach Composition: EOG - 1, LSLRD - 1, GS - 2, PC - 1, Sleeper Class - 4, AC III Tier Economy - 3, AC III Tier - 7 & AC II Tier - 3 = Total 22 LHB Coaches WEF 07/03/2024. Ex. TATA.
Mon Nov 20, 2023 (11:26AM)
▪️ Departure from Tatanagar on 29.10.23 is diverted via Gotlam - Titlagarh - Raipur - Nagpur - Ballarshah - Vijaywada.
Mon Oct 30, 2023 (02:04PM)
▪️ Departure from Barauni on 29.10.23 is diverted via Gotlam - Titlagarh - Raipur - Nagpur - Ballarshah - Vijaywada.
Sun Oct 29, 2023 (10:53PM)
▪️ Departure from Tatanagar on 12.10.23 will be diverted via Rajkharswan - Dongaoposi - Jaroli - Nayagarh - Jakhapura - Cuttack - Vizianagaram
Thu Sep 28, 2023 (09:45AM)
Will stop at Mahadevsal station for 2 minutes on every Sunday from 8 July 2023 to 31 August 2023 (Shravani Mela Period).
Sat Jul 08, 2023 (01:39PM)
A two minute temporary stoppage will be given at Posoita for Bhandara during Shravani Mela on every Sunday from 9 July 2023 to 27 August 2023
Mon Jul 03, 2023 (04:27PM)
🔹 Train no. 18189/Tatanagar - Ernakulam Express (PT) JCO 21st May, 2023 will be rescheduled to leave Tatanagar at 08.45 hrs (Late by 3 hrs 30 mins).
Mon May 15, 2023 (05:05PM)
▪️ Cancelled on 30.04.23
Sun Apr 30, 2023 (11:16AM)
Rescheduled by 2 hours on 23/04/23. Will depart Tatanagar at 07:15 hours.
Fri Apr 21, 2023 (11:10PM)
▪️ Departure from Tatanagar on 25.09.22 & 29.09.22 is cancelled
Tue Sep 20, 2022 (05:04PM)
➡️ Train no.18189 Tatanagar-Ernakulam Junction express, scheduled to reach Salem at 6.42 p.m. on 04.07.22 will be regulated for 20 minutes at a convenient location. ➡️ Train no. 18189 Tatanagar-Ernakulam Express, leaving Tatanagar on July 7, 10, 14 and 17 will run in diverted route via Jaroli-Nayagarh-Cuttack-Khurda Road-Vizianagaram.
Thu Jun 30, 2022
...
more...
(11:34PM)
Due to Non-Interlocking works for commissioning of double line between Titlagarh - Sikir and 3rd line between Titlagarh - Kesinga in Sambalpur Division of East Coast Railway, train num 18189 from Tatanagar to Ernakulam will be diverted via Jaroli, Nayagarh, Cuttack, Khurda Rd, Vizianagaram on journey commencing on 07.07.2022, 10.07.2022, 14.07.2022...
more...
& 17.07.2022.
Mon Jun 27, 2022 (08:19PM)
▪️DL1 is in the back at 2nd Rake. ▪️2nd Rake is running with BE1 instead of SE1▪️Coach Composition to Revise WEF 16.06.2022. New Coach Composition WEF 16.06.2022 Ex - TATA EOG – 1, 2S – 2, SL – 7, 2A – 2, 3A – 5, 3E – 3, LSLRD – 1...
more...
& PC – 1. Total = 22 Coaches
Mon Mar 28, 2022 (06:56PM)
▪️Coach Composition to Revise WEF 16.06.2022. New Coach Composition WEF 16.06.2022 Ex - TATA EOG – 1, 2S – 2, SL – 7, 2A – 2, 3A – 5, 3E – 3, LSLRD – 1 & PC – 1. Total = 22 Coaches
Mon Mar 28, 2022 (06:32PM)
▪️ICF CC -- L DL1 D1 S1 -- S10 PC S11 SE1 B1 -- B4 A1 D2 DL2 ▪️Coach Composition to Revise WEF 16.06.2022. New Coach Composition WEF 16.06.2022 Ex - TATA EOG – 1, 2S – 2, SL – 7, 2A – 2, 3A – 5, 3E – 3, LSLRD...
more...
– 1 & PC – 1. Total = 22 Coaches
Tue Mar 15, 2022 (10:49PM)
📢⚟ To Run with LHB Rake WEF 03.03.2022 Ex - TATA. Coach Composition ; EOG – 1, 2S – 2, SL – 11, 2A – 1, 3A – 4, LSLRD – 1 & PC – 1. Total = 21 Coaches. Coach Composition to Revise WEF 16.06.2022. New Coach Composition WEF 16.06.2022...
more...
Ex - TATA EOG – 1, 2S – 2, SL – 7, 2A – 2, 3A – 5, 3E – 3, LSLRD – 1 & PC – 1. Total = 22 Coaches
Wed Feb 23, 2022 (08:39AM)
📢⚟ To Run with LHB Rake WEF 24.03.2022 Ex - TATA. Coach Composition ; EOG – 1, 2S – 2, SL – 11, 2A – 1, 3A – 4, LSLRD – 1 & PC – 1. Total = 21 Coaches. Coach Composition to Revise WEF 16.06.2022. New Coach Composition WEF...
more...
16.06.2022 Ex - TATA EOG – 1, 2S – 2, SL – 7, 2A – 2, 3A – 5, 3E – 3, LSLRD – 1 & PC – 1. Total = 22 Coaches
Mon Feb 07, 2022 (08:24PM)
📢⚟ To Run with LHB Rake WEF 24.03.2022 Ex - TATA. Coach Composition ; EOG – 1, 2S – 2, SL – 11, 2A – 1, 3A – 4, LSLR – 1 & PC – 1. Total = 21 Coaches. Coach Composition to Revise WEF 16.06.2022. New Coach Composition WEF...
more...
16.06.2022 Ex - TATA EOG – 1, 2S – 2, SL – 7, 2A – 2, 3A – 5, 3E – 3, LSLR – 1 & PC – 1. Total = 22 Coaches
Sun Feb 06, 2022 (08:40AM)
📢⚟ To Run with LHB Rake WEF 24.032022 Ex - TATA. Coach Composition : EOG – 1, 2S – 2, SL – 11, 2A – 1, 3A – 4, LSLR – 1 & PC – 1. Total = 21 Coaches. Coach Composition to Revise WEF 16.06.2022. New Coach Composition WEF...
more...
16.06.2022 Ex - TATA EOG – 1, 2S – 2, SL – 7, 2A – 2, 3A – 5, 3E – 3, LSLR – 1 & PC – 1. Total = 22 Coaches
Sun Feb 06, 2022 (08:22AM)
JCO 23.12.2021 has been Diverted via Gudur Jn. - Renigunta Jn. - Pakala Jn. - Katpadi Jn.
Thu Dec 23, 2021 (08:58PM)
JCO 09 and 12 December 2021 cancelled
Fri Dec 03, 2021 (07:45PM)
2 Sleeper coaches will be added temporarily on 25.11.2021
Wed Nov 24, 2021 (02:21PM)
3 Follows
Bedroll/Linen: AVAILABLE change
Inaugural Run
Thu Oct 01, 1970
Pantry/Catering
✓ Pantry Car
✓ On-board Catering
✓ E-Catering
E-Catering is available at JSG, SBP, TIG, RGDA, VZM, RJY, NLR,...
more...
GDR, KPD, JTJ, SA, ED, TUP & PGT.
Updated: Sep 07 (11:09) by TAGEERUANUBHARADWAJ^
Dep:
Arr:
RSA - Rake Sharing
06 Dedicated Rakes🔹No RSA🔹PM - TATA🔹SM - ERS
Rating: 2.9/5 (46 votes)
cleanliness - average (8)
punctuality - good (8)
food - average (7)
ticket avbl - average (8)
u/r coach - average (4)
railfanning - good (8)
safety - average (7)
LHB Rake

Rake/Coach Position

  0
  L
  1
SLR
  2
 GS
  3
 GS
  4
 S1
  5
 S2
  6
 S3
  7
 S4
  8
 PC
  9
 M1
 10
 M2
 11
 M3
 12
 B1
 13
 B2
 14
 B3
 15
 B4
 16
 B5
 17
 B6
 18
 B7
 19
 A1
 20
 A2
 21
 A3
 22
EOG
▪️4 Rakes have the above mentioned CC. ▪️2 Rakes have different CC - L EOG A1 A2 A3 B1 B2 B3 B4 B5 B6 B7 M1 M2 M3 PC S1 S2 S3 S4 GS GS SLR
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train Forum

Page#    542 blog entries  <<prev  next>>
General Travel
947585 views
5

Jun 27 2022 (19:57)   07791/Kacheguda - Nadikude MEMU | SC/Secunderabad Junction (10 PFs)
SaiRBRTRailway~
SaiRBRTRailway~   3693 blog posts
Entry# 5392647            Tags   Past Edits
Cancellation,Partial Cancellation,Diversion Of Trains,Rescheduling
Translate to English
Translate to Hindi

More Posts
General Travel
96876 views
8

Jun 06 2022 (12:04)   18190/Ernakulam Jn. - Tatanagar Express (PT) | AKVD/Akividu (3 PFs) | RPM/WAP-7/39000
IndianRailwaysSCoR^~
IndianRailwaysSCoR^~   8701 blog posts
Entry# 5369189            Tags   Past Edits
Ernakulam Tatanagar Express is Stopped at Akividu for hr
because of underpass works at bvrt
the double track is single line from UNDI to Bvrt at undi Lingampalli Narasapur Express Stopped For Crossing Visakhapatnam To Mumbai LTT express #TB
Translate to English
Translate to Hindi

1 Posts

67204 views
0

Jun 06 2022 (14:54)
CR_NGP~   22289 blog posts
Re# 5369189-2              
When will the double line movement resume b/w BVRT & UNDI?
Translate to English
Translate to Hindi

63620 views
1

Jun 06 2022 (18:42)
IndianRailwaysSCoR^~
IndianRailwaysSCoR^~   8701 blog posts
Re# 5369189-3               Past Edits
After 2 days Opened anna
Translate to English
Translate to Hindi

58966 views
0

Jun 12 2022 (21:04)
RFIR~
RFIR~   6969 blog posts
Re# 5369189-4              
When is the overall doubling expected to get completed ( NDD-BZA section via BVRT). From RJY till BZA it never runs on time. I have rarely seen it on scheduled in NTES. Similarly from BZA to PER, even with less stoppages and non-peak hours in MAS, amongst all trains this has been given the longest running time of 9 hours which is absolutely not justified given that almost all trains are taking 7/7.5 hours
Translate to English
Translate to Hindi

58997 views
1

Jun 12 2022 (21:11)
saikarthik148~
saikarthik148~   3269 blog posts
Re# 5369189-5              
may be crs will be july ending and opened in august of this year final project will be completed and ndd-bza via ee 127km and via gdv 154 km the difference is only 27 km which might be covered in double line at 20 to 30 min difference
Translate to English
Translate to Hindi

56876 views
0

Jun 13 2022 (11:15)
IndianRailwaysSCoR^~
IndianRailwaysSCoR^~   8701 blog posts
Re# 5369189-6              
Total doubling done this month opening ni works also going
Translate to English
Translate to Hindi
General Travel
115999 views
1

Apr 09 2022 (00:08)   18189/Tatanagar - Ernakulam Jn. Express (PT)
IRF~   1425 blog posts
Entry# 5280560            Tags   Past Edits
rb had sanctioned total 5 lhb rakes for tata-ers exp, where are the coaches gone? not reached ser till date.
also all coaches did not came to ser for hwh-dgha exp till date
why? 2021-22 allotment and now 2022-23 started
Translate to English
Translate to Hindi

5 Posts

82313 views
0

Apr 09 2022 (21:47)
RFIR~
RFIR~   6969 blog posts
Re# 5280560-6              
In fact there is lot of pressure and demand for it to be sent to VSKP. Passengers of Tatanagar (Jamshedpur) used to have daily train to VSKP when it was running as Tata-Alleppey slip express. Now that connectivity has gone and also the time table has also gotten bad....Lets hope that railways considers it to be sent to VSKP.
Translate to English
Translate to Hindi

56192 views
0

Jun 06 2022 (13:34)
UTTARANDHRARAILSEVA~
UTTARANDHRARAILSEVA~   1926 blog posts
Re# 5280560-7              
SER might be using these coaches for other trains
Translate to English
Translate to Hindi

54982 views
0

Jun 06 2022 (13:52)
UTTARANDHRARAILSEVA~
UTTARANDHRARAILSEVA~   1926 blog posts
Re# 5280560-8              
There is a proposal to make Hatia Yeswantpur exp a daily train. So frequency increase of this train is put on hold
Translate to English
Translate to Hindi

56211 views
1

Jun 06 2022 (19:15)
RFIR~
RFIR~   6969 blog posts
Re# 5280560-9              
HTE-YPR cannot be run daily since the same slot/path is being used by Tata-YPR (12289) and HTE-ERS (Weekly).
They can combine HTE-YPR & HTE-BNC since both originate at same place and thus make train triweekly.
Similarly this same slot was also used to run a SBP-YPR special as well. So in existing time slot HTE-YPR is difficult to be made daily.
Translate to English
Translate to Hindi

53736 views
0

Jun 06 2022 (22:26)
UTTARANDHRARAILSEVA~
UTTARANDHRARAILSEVA~   1926 blog posts
Re# 5280560-10              
TT will be changed
Translate to English
Translate to Hindi
General Travel
909295 views
4

Feb 06 2022 (21:45)   18045/East Coast Express (PT)
guest
Entry# 5210981            Tags   Past Edits
lhb updates.
Icf to lhb
1. EastCoast #daily lhbfied wef april
2. Tata ers biweekly also.
3. Both farakka lhbfied in july means #daily lhb
4.
...
more...
Kashi Vishwanath #daily lhbfied.
5. Maurya #daily lhbfied from June
6. Asn csmt from july
7. Cape pune Jayanti Janta #daily lhbfied from April
8. Goa express #daily lhb rake received.
9. Seemanchal #daily lhbfied.
10. Kolkata Jammu #daily 5th rake lhbfied.
11. Pune danapur #daily lhbfied
12. Rewanchal lhbfied #daily 15 april
13. 12167 LTT MUV Q1 #daily
14. 11013 LTT CBE Q1 #daily
15. Ganga Kaveri 18 april biweekly and RSA 16.
16. Chennai SSPN weekly
17. Kulik express #daily from 25 april
18. Hwh SSPN weekly and RSA
19. SRC TPTY weekly
20. Udaipur rishikesh triweekly from April
21 and 22. Tata asr biweekly and tata ypr weekly lhb from may
23.24 12803 swarnajayanti and 12807 samta from April
Lhb to ICF
1. Adi Ngp prerana
2. Jp Ngp sf

Translate to English
Translate to Hindi

More Posts
General Travel
78709 views
2

Apr 19 2022 (18:09)   18189/Tatanagar - Ernakulam Jn. Express (PT)
RFIR~
RFIR~   6969 blog posts
Entry# 5310137            Tags  
The slack towards the end of the journey has been reduced and revised arrival time at Ernakulam is 1:55am at terminating station !! This is with effect from 14-April ( train that left Tata on 14-April).
Adding to the already existing inconvenient time, this has only added to the pain for passengers deboarding at Ernakulam.
Kindly make the required changes with regard to arrival time at ERS.
Translate to English
Translate to Hindi

55017 views
0

Apr 19 2022 (18:14)
Skumar^~
Skumar^~   8184 blog posts
Re# 5310137-1              
Still this change in time is not reflecting in IRCTC. Once irctc updated, the TT will be updated here
Translate to English
Translate to Hindi

48120 views
1

Apr 19 2022 (19:16)
vijaybharadwajs~
vijaybharadwajs~   2002 blog posts
Re# 5310137-2              
Still no use. Also they have to divert this via VSKP. That is also pending
Translate to English
Translate to Hindi

49539 views
0

Apr 19 2022 (19:30)
deepak.yerr~
deepak.yerr~   6677 blog posts
Re# 5310137-3              
VJA to Gudur 6.50Hrs they can reduce the run time to 4.20hrs. 2.5hrs perambur to podanur 30mins can ve reduced DVD to BZa 30-60mins can be reduced. On the entire run atleast 4 hrs can be reduced.
Translate to English
Translate to Hindi

46556 views
0

Apr 19 2022 (21:53)
UTTARANDHRARAILSEVA~
UTTARANDHRARAILSEVA~   1926 blog posts
Re# 5310137-4              
The SCR will reduce the running time by 20 minutes and gives a news paper statement in this way:
ERNAKULAM EXP SPEEDED UP
Translate to English
Translate to Hindi

50217 views
1

Apr 19 2022 (23:06)
RFIR~
RFIR~   6969 blog posts
Re# 5310137-5              
Yes. Quite a few things pending. Stoppage at VSKP is top priority. Passengers from Tata have ended up losing the only daily connectivity to VSKP. Current time is very inconvenient. There was also talk of stoppage at CBE. In return direction regularly reaches Podanur 40-45 min before time and ends up halting for almost an hour. Easily can be sent to CBE as connectivity is much better compared to CBE. Also lot of slack between SBP-JSG section. Overall a better TT can be easily explored for this train
Translate to English
Translate to Hindi
Page#    542 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy