|
Post PNR | Post Blog | Advanced Search |
2 Follows Bedroll/Linen: AVAILABLE change Inaugural Run Thu Nov 17, 2011 Pantry/Catering ✕ Pantry Car ✓ On-board Catering ✓ E-Catering | Updated: Sep 28 (16:49) by SatavahanaSFExp^
RSA - Rake Sharing No RSA. Runs With Dedicated Independent Rake with CDO at GKP | Rating: 3.3/5 (48 votes) cleanliness - good (8) punctuality - average (8) food - average (8) ticket avbl - good (8) u/r coach - good (5) railfanning - good (8) safety - good (8) | ||||
LHB Rake Rake/Coach Position 0 L 1 EOG 2 GS 3 GS 4 GS 5 S4 6 S3 7 S2 8 S1 9 A2 10 A1 11 H1 12 B10 13 B9 14 B8 15 B7 16 B6 17 B5 18 B4 19 B3 20 B2 21 B1 22 SLR 23 HCP Revised Compostion w.e.f. 07 November 2024 will be SLR - 1, EOG - 1, GS - 4, SL - 4, AC 3 - 9, AC 2 - 2, AC 1 - 1. Total 22 LHB Coaches. |
ORAI/Orai
| AY/Ayodhya Dham Jn
|