Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
dark modesite support
 
Fri Sep 20 02:11:12 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Advanced Search
<<prev entry    next entry>>
News Entry# 567738
Sep 02 (20:09) BEML Rolls Out First Driverless Metro Trainsets for Bangalore Airport Line
Entry# 6176703   
  Past Edits
This is a new feature showing past edits to this News Post.
Bengaluru: BEML Rolls Out First Driverless Metro Trainsets For BMRCL

BEML, a leading Indian rail and Metro trainset manufacturer, has inaugurated the prototype production of driverless Metro trainsets for Bangalore Metro Rail Corporation (BMRCL) lines 2 and 6, including the Bengaluru Airport Line. This project, secured in August 2023, is valued at Rs 3,177 crore and involves the design, manufacture, supply,...
more...
installation, testing, and commissioning of 53 six-car trainsets. These trainsets, designed and developed in-house by BEML in Bengaluru, feature high-tensile stainless steel construction for durability and safety, along with two roof-mounted air conditioners per car for passenger comfort. They are equipped with an IP-based PA and PIS system for station information, a surveillance system, and LCD-based route map displays. Passenger safety is enhanced by electrically driven automatic doors synchronized with Platform Screen Doors. The project includes comprehensive maintenance services for up to 15 years under the Bangalore Metro Rail Project Phase 2, 2A, and 2B.

BEML, India mein rail aur Metro trainset banane wala ek bada company, Bangalore Metro Rail Corporation (BMRCL) ke liye driverless Metro trainset ka prototype banane ka kaam shuru kiya hai. Yeh trainsets lines 2 aur 6 ke liye hain, aur isme Bengaluru Airport Line bhi include hai. August 2023 mein aaya...
more...
yeh order, Rs 3,177 crore ka hai aur isme 53 trainsets ka design, manufacturing, supply, installation, testing, commissioning aur 15 saal tak maintenance service bhi include hai. Yeh trainsets 6 coaches ke honge, aur Bengaluru mein BEML ke khud ke engineers ne design aur develop kiya hai. Trainsets mein high-tensile stainless steel use kiya gaya hai, jo ki durable aur safe hai. Har coach mein do roof-mounted air conditioners bhi honge, jisse passengers comfortable rahenge. Yeh trainsets mein IP-based PA and PIS system bhi hai, jisse passengers ko station ki information milegi, aur ek surveillance system bhi hai, aur LCD-based route map display bhi hai. Passengers ki safety ke liye, trainsets mein electrically driven automatic doors lagaye gaye hain, jo ki Platform Screen Doors se synchronized hain. Yeh project Bangalore Metro Rail Project Phase 2, 2A, aur 2B ke under aaya hai.
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy