513 કરોડના ખર્ચે સચિન-ભેસ્તાન સહિત ગુજરાત અને મુંબઈના રેલ્વે સ્ટેશનોની કરવામાં આવશે કાયાપલટAs part of the Amrit Bharat Station Scheme, Western Railway is upgrading 56 stations, including 8 suburban stations (Marine Lines, Charni Road, Grant Road, Lower Parel, Prabhadevi, Malad, Jogeshwari Coaching Terminal, and Palghar) and 11 non-suburban stations (Ambergaon Road, Sanjan, Vapi, Bilimora (Narrow Gauge), Sachin, Bhestan, Bardoli, Nandurbar, Amalner, Dharangaon). The...
more... improvements include the construction of 12-meter wide FOBs with retail kiosks, elevators, and escalators, installation of 'talk back' systems at booking counters for improved communication, enhanced security measures with additional CCTV cameras, and dedicated facilities for differently-abled passengers, such as accessible toilets, drinking water booths, reserved parking, Braille signage, tactile paths, and wheelchairs. The scheme involves an investment of Rs. 513 crore and includes the installation of 69 lifts with 13 more under construction. An additional 13 lifts will be installed after the monsoon season.
Amrit Bharat Station Scheme ke neeche, Western Railway 56 stations ko upgrade kar raha hai, jisme 8 suburban stations (Marine Lines, Charni Road, Grant Road, Lower Parel, Prabhadevi, Malad, Jogeshwari Coaching Terminal aur Palghar) aur 11 non-suburban stations (Ambergaon Road, Sanjan, Vapi, Bilimora (Narrow Gauge), Sachin, Bhestan, Bardoli, Nandurbar, Amalner, Dharangaon)...
more... include hain. Improvements mein 12-meter wide FOBs banna, retail kiosks, elevators aur escalators lagana, booking counters pe 'talk back' system laga ke communication behtar karna, aur CCTV cameras badha ke security measures strengthen karna include hai. Is scheme mein differently-abled passengers ke liye dedicated facilities bhi hain, jaise ki accessible toilets, peene ke paani ke booths, reserved parking, Braille signage, tactile paths aur wheelchairs. Scheme me Rs. 513 crore invest kiya gaya hai aur isme 69 lifts install kiye gaye hain, aur 13 aur ban rahe hain. Monsoon season ke baad 13 aur lifts install kiye jayenge.