यार्ड रिमाडलिंग की तैयारी, सहारनपुर रूट पर 20 दिन रहेगा असर; रद्द या टर्मिनेट होंगी ट्रेनेंThe Meva Navada station yard on the Moradabad-Saharanpur route is undergoing remodeling, causing disruptions to train operations for 20 days starting September 29th. The work includes extending the platform and creating an additional loop line for non-stop trains traveling from Saharanpur to Moradabad. The remodeling is expected to improve train operations....
more... While the railway administration is trying to minimize passenger inconvenience, some trains, like the Saharanpur Memu and Rishikesh-Chandausi Passenger, have been canceled for 20 days starting September 14th. The initial phase of the remodeling work has already begun.
Moradabad-Saharanpur route pe Meva Navada station yard ka remodeling ho raha hai, jisse 29 September se 20 dinon tak train operations mein problem aayegi. Platform ko extend kiya ja raha hai aur Saharanpur se Moradabad jaane wali non-stop trains ke liye ek loopline bhi banai ja rahi hai. Is remodeling se...
more... train operations mein improvement aane ki ummeed hai. Railway administration passenger ki problem ko kam karne ki koshish kar raha hai, lekin kuch trains, jaise Saharanpur Memu aur Rishikesh-Chandausi Passenger, 14 September se 20 dinon ke liye cancel ho gayi hain. Remodeling ka pehla phase shuru ho chuka hai.