Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sat Sep 21 19:36:21 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 5983458
Posted: Mar 01 (11:56)

No Responses Yet
Rail News
13523 views
0

Other News
NCR/North Central
Mar 01 (11:56)   ROBs in Prayagraj Nearing Completion for Maha Kumbh, Traffic Diverted

AdittyaaSharma^~   73768 news posts
Entry# 5983458         Tags   Past Edits
भीरपुर, बामपुर आरओबी के अंतिम चरण का काम शुरू हुआ

The construction of 15 Road Over Bridges (ROBs) in Prayagraj district is underway to be completed by March 31st, 2024, in preparation for the Maha Kumbh Mela. Four ROBs are already complete, and the Bheerpur and Bampore ROBs are nearing completion with only the upper section remaining. To facilitate the installation...
more...
of girders, traffic will be diverted for three days, from March 1st to 3rd, with alternate routes provided for both locations. The Bheerpur ROB has a total length of 717.469 meters, with a railway portion of 93 meters and a Setu Nigam portion of 624.69 meters. Its total cost is ₹4223.18 lakhs. The Bampore ROB has a total length of 781.696 meters, with a railway portion of 69.75 meters and a Setu Nigam portion of 711.946 meters. Its total cost is ₹4795.30 lakhs. Anirudh Kumar, Project Manager of Setu Nigam, stated that the beam launching process is crucial and requires a traffic block for safety purposes, necessitating the use of alternate routes for three days.

Prayagraj mein Maha Kumbh ke liye ban rahe 15 ROBs, 31 March 2024 tak ready hone wala hai. 4 ROBs toh already ban gaye hai, aur Bheerpur aur Bampore ke ROBs bhi almost complete ho gaye hai. Sirf upper section ka kaam bacha hai. Girder lagaane ke liye 1 March se...
more...
3 March tak traffic divert karenge, aur dono locations ke liye alternate routes diye gaye hai. Bheerpur ROB ki length 717.469 meter hai, jisme 93 meter railway ka portion hai aur 624.69 meter Setu Nigam ka portion hai. Iska total cost ₹4223.18 lakhs hai. Bampore ROB ki length 781.696 meter hai, jisme 69.75 meter railway ka portion hai aur 711.946 meter Setu Nigam ka portion hai. Iska total cost ₹4795.30 lakhs hai. Setu Nigam ke Project Manager, Anirudh Kumar ne bataya ki beam launching kaam bahut important hai aur safety ke liye traffic block karna jaruri hai. Is wajah se 3 din tak alternate routes use karna padega.

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

5341825 ★★ 24SreeNdl^~
5595577 ★★★ 32RoyalIndianRailway...
6191858 ★★ 25SreeNdl^~
1959644 ★★★ 270Arpit~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy