Gwalior News: धौलपुर-हेतमपुर के बीच तीसरी लाइन पर 120 किमी की रफ्तार से दौड़ाई ट्रेनOn Wednesday, a speed trial was conducted on the new third line between Dholpur and Hetampur, with a train running at 120 km/h. The Commissioner of Railway Safety (CRS) for the North Eastern Region, Mumbai, Pranajeev Saxena, inspected the track, bridges, and other infrastructure from an inspection carriage and a motor...
more... trolley. He expressed satisfaction with most aspects of the construction. The CRS's approval will allow train operations on the new track to begin. This third line, part of a larger 165 km project between Jhansi and Dholpur, has seen 42 km of track already operational. The section between Morena and Dholpur is also complete. Train operations on parts of the Jhansi-Gwalior-Lalitpur line are underway, with increased speed limits.
Wednesday ko Dholpur aur Hetampur ke beech new third line pe speed trial kiya gaya, train 120 km/h ki speed se chali. Mumbai ke North Eastern Region ke Commissioner of Railway Safety (CRS), Pranajeev Saxena, ne inspection carriage aur motor trolley se track, bridges aur other infrastructure ki inspection ki. Unhone...
more... construction ke zyadatar aspects se satisfaction dikhayi. CRS ke approval ke baad, is track pe train operation start ho jayenge. Yeh third line, Jhansi aur Dholpur ke beech 165 km ke project ka part hai, jismein 42 km track pe train operation already start ho chuka hai. Morena aur Dholpur ke beech ka section bhi pura ho gaya hai. Jhansi-Gwalior-Lalitpur line ke kuchh parts pe train operation chal raha hai, aur speed limits bhi badha di gayi hain.