If they put corridor blocks they can't run new day intercity trains in future. This block has resulted in fixing NGP SC VB at 500 to reach 1215 has failed generate occupancy. Vskp SC at 1415 and shifting LTT express via GNT between 1215 to 1415 corridor Block then what about Golconda departing Kazipet at 1040-1100 and arriving SC at 1355 cutting the corridor Block?