BEML bags 210-Coach Rolling Stock Contract for Chennai Metro Phase 2BEML Ltd. has been awarded a contract by Chennai Metro Rail Ltd. (CMRL) to supply 210 coaches for Chennai Metro’s Phase 2 project, which includes Lines 3 and 5. The contract, ARE02A, covers 70 train sets of three cars each, along with a 15-year maintenance agreement. BEML emerged as the lowest...
more... bidder after re-bidding, with their bid estimated at around Rs. 3087 crore. The upcoming trains will operate on the new 45.4 km Line-3 (Madhavaram – Siruseri SIPCOT) and 44.6 km Line-5 (Madhavaram – Sholinganallur) and will adhere to Grade of Automation-4 (GoA4) standards, enabling driverless operations. The contract scope includes design, manufacture, supply, testing, commissioning, training, and depot machinery maintenance. Meanwhile, Alstom is nearing the rollout of its first 3-coach train for Line-4. Another rolling stock contract for Line-3 and Line-5, under Package ARE04A, is currently under bid, with technical bid openings scheduled for October 19.
Chennai Metro Rail Ltd. (CMRL) ne Chennai Metro ke Phase 2 project ke liye 210 coaches supply karne ka contract BEML Ltd. ko diya hai. Yeh contract, ARE02A, 70 train sets, har set mein 3 coaches, aur 15 saal ka maintenance agreement include karta hai. BEML, re-bidding ke baad, sabse...
more... kam bid denewala tha, unki bid lagabhag Rs. 3087 crore ki hai. Naye trains 45.4 km Line-3 (Madhavaram – Siruseri SIPCOT) aur 44.6 km Line-5 (Madhavaram – Sholinganallur) par chalenge aur Grade of Automation-4 (GoA4) standards follow karenge, jisse driverless operations possible honge. Contract mein design, manufacture, supply, testing, commissioning, training, aur depot machinery maintenance bhi include hai. Iske alawa, Alstom apna pehla 3-coach train Line-4 ke liye jaldi launch karne wala hai. Line-3 aur Line-5 ke liye, Package ARE04A ke under, ek aur rolling stock contract ke liye bidding chal rahi hai, jiska technical bid opening October 19 ko hoga.