Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sat Sep 21 11:12:17 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 6154910
Posted: Aug 12 (20:19)

No Responses Yet
Rail News
2468 views
0

Metro
CMRL/Chennai Metro
Aug 12 (20:19)   Chennai Metro To Build New Double Elevated Depot In Nookampalayam For Phase-2 Project

Exynos9611~   19647 news posts
Entry# 6154910         Tags   Past Edits
Chennai: New Double Elevated Depot To Boost Driverless Train Services In Phase-2

Chennai Metro Rail is constructing a new double elevated depot in Nookampalayam, near Sholinganallur, for its Phase-2 project. This depot will be the third for the 116.1 km project, joining the ones in Madhavaram and Poonamallee. The Nookampalayam depot, similar to the Wimco Nagar depot, will have an upper level...
more...
for operations during the rainy season and will support trains on Corridor-3, running from Madhavaram Milk Colony to Siruseri Sipcot. It is expected to be operational after Phase-2 starts, around a year or two later, to accommodate the increased passenger volume. Until then, Siruseri Sipcot will house 12-15 trains overnight with an elevated wash plant for cleaning. The originally planned depot at Siruseri was scrapped to reduce the project cost from Rs 89,000 crore to Rs 63,246 crore. The Madhavaram and Poonamallee depots will handle major and minor repairs for trains on Corridors 3, 4, and 5.

Chennai Metro Rail, apna Phase-2 project ke liye, Nookampalayam mein, Sholinganallur ke paas, ek nayi double elevated depot banaya ja raha hai. Ye depot 116.1 km ke project ke liye teesra hoga, Madhavaram aur Poonamallee ke depots ke saath. Nookampalayam depot, Wimco Nagar depot jaisa, rainy season mein operation ke liye...
more...
ek upper level hoga, aur Madhavaram Milk Colony se Siruseri Sipcot tak Corridor-3 pe chalne wali trains ko support karega. Iske Phase-2 start hone ke baad, ek ya do saal baad operational hone ki umeed hai, badhte huye passenger volume ko sambhalne ke liye. Tab tak, Siruseri Sipcot mein 12-15 trains overnight park honge, ek elevated wash plant saaf safai ke liye. Siruseri mein originally plan kiya gaya depot project cost ko Rs 89,000 crore se kam karke Rs 63,246 crore karne ke liye cancel kar diya gaya. Madhavaram aur Poonamallee depots Corridor 3, 4 aur 5 pe chalne wali trains ki major aur minor repair karenge.

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

6191858 ★★ 24SreeNdl^~
5341825 ★★ 21SreeNdl^~
1959644 ★★★ 270Arpit~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy