Development work is going on in full swing in South Side of Dangoaposi station. Presently, it is not clear what work is being done. Earlier laying waste land beyond line no. 1 is being cleared and a lot of concrete slabs which are used under railway tracks are being kept alongwith lot of sacks and other building materials. A lot of workers are also seen camping in the area. It seems that more lines may be laid beyond line no. 1 in the near future.