Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
IRI is in Maintenance Mode. Blog Postings and other site edits will not work for about 5 minutes.
Fri Sep 27 20:56:19 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 6013310
Posted: Mar 29 (21:48)

No Responses Yet
Rail News
1775 views
0

Metro
Mar 29 (21:48)   Kanpur Metro's Phase I Sees First Tunnel Breakthrough by TBM 'Azad'

Exynos9611~   20150 news posts
Entry# 6013310         Tags   Past Edits
Kanpur Metro: TBM Azad Achieves Breakthrough at Nayaganj for Package KNPCC-06 TBM and Breakthrough The Package Kanpur Metro Phase I Line I

Afcons-Sam India Consortium's TBM 'Azad' has completed its first tunnel breakthrough for Kanpur Metro's Phase I project. The TBM, a Herrenknecht Earth Pressure Balance machine, built a 1250m long underground tunnel from Kanpur Central Station to Nayaganj Station. This is the seventh breakthrough for the project, following the completion of the...
more...
sixth and final breakthrough by Gulermak – Sam India Builtwell JV's TBM 'Tatya' for Line-1's MacRobertganj Ramp – Nayaganj section. The 4.65-km Package KNPCC-06, awarded to Afcons-Sam India Consortium in March 2022, includes construction of the TBM tunnel, cut and cover tunnel, an underground ramp, and three underground metro stations: Transport Nagar, Jhakarkatti, and Kanpur Central.

Kanpur Metro ke Phase I project mein Afcons-Sam India Consortium ka TBM 'Azad' ne apna pehla tunnel breakthrough kar liya hai. Yeh TBM, Herrenknecht Earth Pressure Balance machine hai, aur isne Kanpur Central Station se Nayaganj Station tak 1250m lamba underground tunnel banaya hai. Yeh project ka saatvaan breakthrough hai, Gulermak...
more...
– Sam India Builtwell JV ke TBM 'Tatya' ke Line-1 ke MacRobertganj Ramp – Nayaganj section ke liye chhatha aur final breakthrough hone ke baad. March 2022 mein Afcons-Sam India Consortium ko diya gaya 4.65-km Package KNPCC-06 mein TBM tunnel, cut and cover tunnel, ek underground ramp aur teen underground metro stations: Transport Nagar, Jhakarkatti, aur Kanpur Central ka construction shamil hai.

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy