Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
IRI is in Maintenance Mode. Blog Postings and other site edits will not work for about 5 minutes.
Fri Sep 27 22:54:46 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 5916329
Posted: Dec 19 2023 (20:15)

No Responses Yet
Rail News
2018 views
0

IR Affairs
CR/Central
Dec 19 2023 (20:15)   Ghatkopar Railway Station Gets Major Upgrades to Ease Overcrowding

Exynos9611~   20150 news posts
Entry# 5916329         Tags   Past Edits
Upgraded Ghatkopar Station to be thrown open on Dec 25

Ghatkopar railway station in Mumbai is undergoing major upgrades to ease overcrowding caused by the convergence of local trains and the Versova-Andheri-Ghatkopar Metro-1. A new 12-meter wide, 75-meter long foot over bridge (FOB) connecting platforms 1/2/3/4 to the east side of the station is being built, along with escalators on...
more...
platforms 2/3/4. Additionally, an elevated deck is being constructed to connect the new FOB to the existing Metro 1 bridge, easing congestion on the metro FOB and allowing for smoother passenger movement. The project, estimated at ₹60-70 crore, also includes more ticket counters, food stalls, and shops, with the first phase being completed by December 25, 2023.

Mumbai ke Ghatkopar railway station pe bahut saare upgrades ho rahe hain, taaki local trains aur Versova-Andheri-Ghatkopar Metro-1 ki wajah se hone wali over crowding ko kam kiya ja sake. Ek nayi 12 meter chaudi aur 75 meter lambi foot over bridge (FOB) banayi ja rahi hai jo platforms 1/2/3/4...
more...
ko station ke east side se connect karegi. Iske saath hi platforms 2/3/4 pe escalators bhi lagaye ja rahe hain. Iske alawa, ek elevated deck bhi banaya ja raha hai jo naye FOB ko existing Metro 1 bridge se connect karega, jisse metro FOB pe bheed kam hogi aur passengers aaram se ek platform se dusre platform aur station ke bahar ja payenge. Is project ka cost ₹60-70 crore aane ka anuman hai aur iska pehla phase 25 December, 2023 tak complete ho jayega.

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy