#Tender
Consultancy Services for Detailed Project Report and Detailed Design Consultancy in connection with Execution of Final Location Survey, Soil Investigation, Preparation Yard Plans, Slope stability analysis and Submission of various detailed Design & Drawings between (i) Nimpura Reception Yard-Kharagpur 3rd Line (4.40 Km), (ii) Hijli-Nimpura 3rd Line (5 Km), (iii) Nimpura Reception Yard-Kharagpur 4th Line (4.00 Km), (iv) KharagpurTatanagar 4th Line (134.1 Km) & (v) Kalaikunda-Nimpura West Outer-Gokulpur Connectivity Avoiding Nimpura Reception Yard (5 Km) under the jurisdiction of Dy CE/Con/Kharagpur of S. E. Railway. Estimate Nos. 14/FLS-SUR/2022, 15/FLS-SUR/2022, 16/FLS-SUR/2022,...
more... 24/FLS-SUR/2022 and 25/FLS-SUR/2022.
................
Approx. Cost: Rs. 3.23 Cr, Bid Security: Rs. 3,11,600/- & Completion period: 06 months