Kurduwadi-Pangri, Solapur-Hotgi Electrification CRS Inspection From Dec 8.
The Commissioner of Railway Safety (Central Circle) Mumbai will inspect the route electrification works of two sections located in Central Railway’s Solapur division on December 8 and 9 respectively.
The...
more... sections are Kurduwadi-Pangri single line section between Kurduwadi – Latur on December 8 and the Solapur-Hotgi double line on December 9.
The inspection schedule on December 8 includes an inspection of the Pangri-Kurduwadi section aboard a tower wagon followed by a speed trial using an inspection car in the reverse direction. On December 9, the CRS will first inspect the Solapur-Hotgi section aboard a tower wagon followed by a speed trial in the reverse direction aboard an inspection car.
Route electrification of these sections has been done by rail PSU RVNL.