News Entry# 0
▶️ Will Run With LHB Coaches from 27-12-2018; ▶️ CC for LHB Rake - SL - 11, 3A -3, 2A -2 , 2A cum 1A - 1, GS-2, EOG -2. Total - 21 Coaches
S3,S4 De-reserved between CAPE-ERN S12 De-reserved between CAPE-PGT in ICF rake and S11 De-Reserved Between CAPE-PGT in LHB rake.
News Entry# 0
▶️ Will Run With LHB Coaches from 27-12-2018; ▶️ One of the three Rakes will Run with LHB Coaches now.; ▶️ CC for LHB Rake - SL - 11, 3A -3, 2A -2 , 2A cum 1A - 1, GS-2, EOG -2. Total - 21 Coaches
S3,S4 De-reserved between CAPE-ERN S12 De-reserved between CAPE-PGT in ICF rake and S11 De-Reserved Between CAPE-PGT in LHB rake.