News Entry# 0
▶️ Will Run with LHB Coaches from 25-12-18; ▶️ CC for LHB Rake - SL - 11, 3A -3, 2A -2 , 2A cum 1A - 1, GS-2, EOG -2. Total - 21 Coaches; S3,S4 De-reserved between ERN-CAPE S12 De-reserved between PGT-CAPE in ICF rake and S11 dereserved between PGT-CAPE in LHB rake
News Entry# 0
▶️ Will Run with LHB Coaches from 25-12-18; ▶️ One of the three Rakes will Run with LHB Coaches now.; ▶️ CC for LHB Rake - SL - 11, 3A -3, 2A -2 , 2A cum 1A - 1, GS-2, EOG -2. Total - 21 Coaches; S3,S4 De-reserved between ERN-CAPE S12 De-reserved between PGT-CAPE in ICF rake and S11 dereserved between PGT-CAPE in LHB rake