MAU LKO should Introduce via ARJ JNU SLN LKO. Bcoz This Section will conect LKO From JNU within 4 Hr.
If Train will originate From ARJ Then Thare will have to Loco Revershel at MAU and SHG.
And JNU-JOP Chord 2.2 KM line is Sanctioned Work will be Completed Soonly. MAU LKO via JNU will have to at ZBD For Temperory Period.