Mar 10 2018 (15:43) When after 2014-15, many trains started diverting from here, this platform was ignored and platform 2-3 was constructed that time in south side Now But now it has is been being renovated to increase height and for 26 bogie type Pic 5: New approach road decreasing distance of ACOI from Ald by 1 km (900 metres exactly)
Mar 10 2018 (15:41) No platform height(concreting), no shed, no toilets, no shopstalls etc North side line (Up line mentioned above) is one two metre metres far from the platform Pic 5: New approach road decreasing distance of ACOI from Ald by 1 km (900 metres exactly)
Mar 10 2018 (11:28) Station Tag: Howrah Junction/HWH added by mksald123~/1345607
Mar 10 2018 (11:28) Station Tag: Mughal Sarai Junction/MGS added by mksald123~/1345607
Mar 10 2018 (11:28) Station Tag: Mughal Sarai Junction/MGS added by mksald123~/1345607
Mar 10 2018 (11:28) Station Tag: Patna Junction/PNBE added by mksald123~/1345607
Mar 10 2018 (11:28) Station Tag: New Delhi/NDLS added by mksald123~/1345607
Mar 10 2018 (11:28) Station Tag: Prayag Junction/PRG added by mksald123~/1345607
Mar 10 2018 (11:28) Station Tag: Allahabad Junction/ALD added by mksald123~/1345607
Mar 10 2018 (11:28) Station Tag: Allahabad Chheoki Junction/ACOI added by mksald123~/1345607
Platform 1 (after increasing of height and increase of length for 26 boggies and shed making) Earlier this platform had only station board before 2014-15 No platform height(concreting), no shed, no toilets, no shopstalls etc When after 2014-15, many trains started diverting from here, this platform was ignored and platform 2-3 was constructed that time in south side. But... more...
now it is being renovated to increase height and for 26 bogie type. But I think railway didn't plan well. In North there are two lines, up and down for main line (ndls hwh) Then this platform 1 having opening only to recieve train towards one end (south end) North side line (Up line mentioned above) is two metres far from the platform. Then there are six loop lines towards its south. Then platform 2-3 combined. I think if railway ne centre wali 6 loop lines me se do lines hatakar platform banaya hota to platform ke dono side ka utilisation ho jaata But now only one side is used Pic 1: Platform 1 seen from FOB Pic 2: Allahabad Chheoki stn from road side Pic 3: Platform 2-3 seen from FOB Pic 4: New escalator at ACOI stn Pic 5: New approach road decreasing distance of ACOI from Ald by 1 km (900 metres exactly)
Mar 15 2018 (15:30) Are appropriate facilities there like Cloakroom, Food Stalls, Waiting Hall etc ? New Platform, Food Court, yards etc Awesome coverage BTW
Are appropriate facilities there like Cloakroom, Food Stalls, Waiting Hall etc. ? What are the future plans for this Station ? New Platform, Food Court, yards etc. ? Awesome coverage BTW
DHANBAD NEWS : धनबाद रेल मंडल में ट्रेनों में सफर करने वाले यात्री कॉकरोच व कोच में गंदगी से परेशान हैं और सोशल मीडिया एक्स के माध्यम से रेलवे के समक्ष समस्याओं को रख रहे हैं. DHANBAD...
बीते 18 सितंबर को नारायणपुर अनंत स्टेशन के गुमटी संख्या 98 पर बेपटरी हुई मालगाड़ी के मैकेनिकल रैक को वापस भिलाई भेज दिया गया है। बीते दो दिनों से यह न मुजफ्फरपुर,...
In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings.
1. All Red Ratings will require further explanation. Red Ratings won't...
As announced previously, there are a few changes coming to IRI user accounts, based on past practices.
1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
Followup to: Fmt Changes
The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging.
It...
There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED.
We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Important Note:This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks. Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.